Castle Hill / Bath Road Active Travel Scheme - Bus Lane Reduction

We are currently consulting on the implementation of traffic restrictions in the form of double yellow lines and reducing an existing bus lane on Bath Road - Castle Hill.

If you have any questions, please contact transport@reading.gov.uk

Please can you let us have your responses by 30th October 2026.

You're viewing real-time data. Participant counts are continuously updated for administrators. Please note that regular users see cached data, which may result in slight differences in the numbers.
14 participants

Phases

Phases overview

Survey

8 October 2026 23:00 - 30 October 2026 23:59

Alteration to residents’ parking bays on Castle Hill (double yellow lines)

The existing eastbound lane on Castle Hill has two sections of residents’ parking bays (Permit Holders zone 08R). These are approximately 27m and 15m in length and in theory provide up to 8 parking spaces. However, the existing bay of 27m includes dropped kerbs, providing access to 156 Castle Hill, and therefore reducing the useable parking space to approximately 6 or 7 cars. 3.4.

The active travel plan for the segregated cycle track on the eastbound carriageway formalises the need for a gap for access crossovers and these proposals are that parking restrictions totalling 11m be implemented in the location. The result of which will be to reduce the overall capacity for Residents Parking from 7 to 6 cars, however, will ensure that driveways remain clear and accessible for residents in the area.

Alteration to eastbound bus lane on Bath Road

The existing layout of Bath Road includes a bus lane for eastbound buses from 48 Bath Road to Janson Court, a distance of 538m. In order to accommodate two segregated cycle tracks at the west end of Bath Road it is necessary to adjust the bus lane to start at 40 Bath Road where the carriageway width becomes sufficient to provide a LTN1/20 compliant ‘wide’ combined bus and cycle lane. This reduces the length of the bus lane by 66m.

Due to the reducing width of Bath Road towards its western end and the junction with Berkeley Avenue, to keep the current length of the bus lane would require the bus lane to be made wider to safely accommodate the use of cycles in accordance with the current LTN1/20 guidance. This would have the effect of removing the ability to provide a westbound cycle track for the same approximate distance of 66m and across the western end vehicular entrance to Benyon Court.